Projects

Mt Magnet Hybrid Power Station PV Array

Overview The Mt Magnet Gold Mine operation required an expanded power station to support increased ... Read more
Read more

Fortescue Solomon Power Station Construction

Solomon Power Station is a gas-fired operation providing power to Fortescue’s Solomon Hub iron ore mining complex in the Pilbara region of WA.
Read more

RTIO EII MCC Replacement Project

Decommissioning, replacement installation and commissioning of Seven (7) outdoor MCCs for thyssenkrupp Industrial Solutions as part of the Rio Tinto East Intercourse Island (EII) Stacker Replacement Project.
Read more

Obuasi Gold Mine PCS Upgrade

SG Controls were engaged to design, commission and manage the control system upgrades for the Obuasi Gold Mine as part of the recent mine expansion and modernisation.
Read more

BHP MAC ST01 & ST02 Sustainability Project

The aim of this project is to increase the Stacking Capacity from 4,250 TPH to 6,500 TPH by the incorporation of a VVVF and multiple Structural / Mechanical Upgrades to the existing systems.
Read more

Tasiast Gold Optimisation Project Upgrade

SGC Australia were awarded the plant wide design and commissioning of the Electrical switchboards, PLC and SCADA systems on Phase 1 of the Tasiast Expansion Project in Mauritania
Read more

Past Projects


Mt Magnet Hybrid Power Station PV Array

Overview The Mt Magnet Gold Mine operation required an expanded power station to support increased mine operations and reduce reliance on fossil fuel power generation. The new, hybrid power station includes 7MW of installed fixed panel arrays and 11MW AC capability across two central inverters, providing support for further expansions in the future. Services Provided … Read more

Tasiast Gold Optimisation Project Upgrade

SGC Australia were awarded the plant wide design and commissioning of the Electrical switchboards, PLC and SCADA systems on Phase 1 of the Tasiast Expansion Project in Mauritania

BHP MAC ST01 & ST02 Sustainability Project

The aim of this project is to increase the Stacking Capacity from 4,250 TPH to 6,500 TPH by the incorporation of a VVVF and multiple Structural / Mechanical Upgrades to the existing systems.

RTIO EII MCC Replacement Project

Decommissioning, replacement installation and commissioning of Seven (7) outdoor MCCs for thyssenkrupp Industrial Solutions as part of the Rio Tinto East Intercourse Island (EII) Stacker Replacement Project.

Obuasi Gold Mine PCS Upgrade

SG Controls were engaged to design, commission and manage the control system upgrades for the Obuasi Gold Mine as part of the recent mine expansion and modernisation.